Large-scale
The project was complex in nature and a large building to survey.
Out of hours working
To fit around an occupied site, we had to work flexibly.
Fire damage in the voids
There was vast material in the voids that could have been confused with asbestos. Therefore, we had to undertake more sampling and inspection than usual. This meant we could accurately highlight on plans where asbestos material was present – a critical part of the asbestos removal tender.
Asbestos Insulating Board – Firebreaks
A lot of 1960s buildings have asbestos boarding firebreaks in situ. Because the client is upgrading them, they have to identify where they are (behind fibreglass). Less experienced surveyors could miss this.
Column casings
CLASP schools typically use a steel-framed structure that contains asbestos. Unfortunately, asbestos is often hidden away within the steel work – which makes it very difficult to survey.
On-going support
We continue to consult with the appointed principal contractor.